Pothole Repair
Darryl McGill (GROA President) contacted Ryan Paisley, the Bellbrook City Service Director, about the pothole at Callaway and Sheffield after discussions at the annual meeting. Ryan has committed to repair early this week. He said the “hot mix” plants just opened, so he is able to get a patch material better than cold mix. The better solution is to first crack seal the street then put a slurry mixture over the street to complete the repair.